Integrated Material Tracking System
In order to use the integrated information management system and to control and to track
materials and productions in pipe mills and coating plants, the “Quality Control “division has
established Integrated Material Tracking System to present information in
the different stations regarding tests, and to follow the productions according to the
customers’ requests.
This mechanized system in addition to create a direct informational relationship between
production and coating systems with the other established quality systems can provide the
automatic release of productions and preparing of special reports and diagrams to be used
by managers and applicants.
Also establishment of the Pipe History System (PHS), Coating History System (CHS),
Material Laboratory System (MLS) as well as Product Release System (PRS) with a uniform
structure in Integrated Material Tracking system has made it possible that to satisfy the customers, control of information
and checking of the pipe production and coating in various informational formats be
prepared.
.